Portuaria led the design, manufacture and installation of a new 2-tonne port crane for the Real Club Náutico de Barcelona, intended for the new sailing-school area developed as part of the expansion of the port concession.
The work is part of a comprehensive project that included a new floating installation and a haul-out ramp aimed at optimising the operation of the light craft used in training and sports activities.
The crane incorporates a frequency inverter for progressive starts and stops, a load limiter to guarantee operational safety and a push-button control system, with a design optimised for port environments and marinas.